SAICE

ASCE Standard 21.4-08 Automated People Mover Standards- Part 4 Security Emergency Preparedness, Syst

R453,95 Incl. VAT

Product Code: TD/ASC/ASCA4
ANSI/ASCE/T&DI 21.4-08 is Part of the four – part Automated People Mover (APM) Standards, which establishes the minimum set of requirements necessary to achieve an acceptable level of safety and performance for an APM system.

Additional information

Weight 500 g
Author

ASCE

Publisher

ASCE

ISBN Number

9780784409534

Year

2002

CONTENTS

1. GENERAL 1

1.1 SCOPE 1

1.2 EXISTING APPLICATIONS 1

1.3 NEW APPLICATIONS 1

1.4 REFERENCE STANDARDS 1

1.5 DEFINITIONS 1

12. SECURITY 3

12.1 SYSTEM SECURITY PROGRAM 3

12.1.1 Management and Accountability 3

12.1.2 Security Problem Identification 3

12.1.3 Employee Selection 3

12.1.4 Training 3

12.1.5 Audits and Drills 3

12.1.6 Document Control 3

12.1.7 Access Control 3

12.2 SYSTEM SECURITY PROGRAM PLAN 3

13. EMERGENCY PREPAREDNESS 4

13.1 EMERGENCY PREPAREDNESS PROGRAM PLAN 4

13.1.1 Objective of Plan 4

13.1.2 Contents of Plan 4

13.1.3 Guidance 5

13.2 TRAINING AND DRILLS 5

13.3 POST-EMERGENCY INCIDENT AND DRILL COORDINATION 5

14. SYSTEM VERIFICATION AND DEMONSTRATION 5

14.1 APPLICABILITY OF PRIOR VERIFICATION 5

14.2 METHODS OF VERIFICATION 5

14.3 SYSTEM VERIFICATION PLAN 6

14.3.1 Plan Requirements 6

14.3.2 Verification Sequence 6

14.3.3 Inspection and Test Procedure Documentation 6

14.4 MINIMUM VERIFICATION REQUIREMENTS 7

14.5 APPLICATION-SPECIFIC ACCEPTANCE REQUIREMENTS 7

15. OPERATIONS, MAINTENANCE, AND TRAINING 7

15.1 SYSTEM OPERATIONS PLAN 7

15.1.1 System Operational Strategies 7

15.1.2 Manual of Operating Procedures 7

15.1.3 Staffing Plan 13

15.2 MANAGEMENT PLAN 13

15.3 PLANNED SYSTEM STARTUP AND SHUTDOWN 13

15.3.1 Planned System Startup 13

15.3.2 Planned System Shutdown 13

15.3.3 Unscheduled System Shutdown/Startup 13

15.4 SERVICE RESTORATION ANALYSIS 13

15.5 ALARMS AND MALFUNCTIONS REPORTING 14

15.6 RECORDKEEPING AND MANAGEMENT REPORTS 14

15.7 MAINTENANCE 14

15.7.1 System Maintainability 14

15.7.2 Maintenance Plan 14

15.7.3 Maintenance Manuals 14

15.8 TRAINING 15

15.8.1 Training Plan 15

15.8.2 Training Instructors 15

15.8.3 Training Materials 15

15.8.4 Ongoing Training 15

15.8.5 Training Manuals 15

16. OPERATIONAL MONITORING 16

16.1 SYSTEM OPERATIONAL MONITORING PLAN 16

16.2 ANNUAL INTERNAL AUDIT RESPONSIBILITIES 16

16.2.1 Audit Responsibility 16

16.2.2 Audit Reporting 16

16.2.3 Audit Procedures 16

16.2.4 Audit Elements 16

16.3 INDEPENDENT AUDIT ASSESSMENT 17

16.3.1 Independent Audit Requirements 17

16.3.2 Independent Audit Reporting 17

16.4 INSPECTIONS AND TESTS 17

16.4.1 Manufacturer Tests 17

16.4.2 Test Acceptance Criteria 18

16.4.3 Test Procedures 18

16.4.4 Operational Testing Limits 18

16.5 CONFIGURATION MANAGEMENT 18

16.6 INTERDEPARTMENTAL AND INTERAGENCY COORDINATION 18

16.7 EMPLOYEE SAFETY PROGRAM 18

16.8 HAZARDOUS MATERIALS PROGRAMS 18

16.9 DRUG AND ALCOHOL ABUSE PROGRAMS 18

16.10 CONTRACTOR SAFETY COORDINATION 18

16.11 PROCUREMENT 18

ANNEX A. RECOMMENDED PRACTICE FOR ACCEPTANCE OF AN APM SYSTEM APPLICATION 19

ANNEX B. INSPECTION AND TEST GUIDELINES 20

ANNEX C. BIBLIOGRAPHY 23

INDEX 25