SAICE

FIDIC Carbon Emissions Management (CEM) Guidance and Annex for the Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer (Red Book) Second Edition 2017, Reprinted 2022 with Amendments

R1250,00 Incl. VAT

Product Code: TD/FID/CEMRB
CEM Provisions for the Red Book 2017 Reprint 2022 – Guidance for the Preparation of Particular Conditions – Part A, B; Guidance for the Preparation of CEM Amendments to the General Conditions of the DAAB Agreement and of the DAAB Procedural Rules; Annex A–Example Calculation of CE Damages and CE Incentives The FIDIC Carbon Emissions Management (CEM) Guidance, developed alongside the International Federation of Consulting Engineers (FIDIC) Carbon Management (CM) Guide, provides a practical contractual framework for managing greenhouse gas (GHG) emissions in construction projects. Building on FIDIC’s established principles of balanced risk allocation, the publication introduces a dedicated CEM Clause and Schedule of Carbon Emissions that integrate seamlessly with existing FIDIC contracts, including the FIDIC Red Book 2017. The Guidance transforms sustainability objectives into measurable contractual obligations, establishing mechanisms such as a Carbon Emissions Budget, reporting procedures, incentives for emissions reductions, and damages for exceedances. Designed to maintain contractual stability while embedding carbon management into project delivery, this book equips employers, contractors, and drafters with the tools needed to achieve accountable, lifecycle-based carbon emissions management in construction. This Guidance consists of five distinct sections: Section 1: Guidance for the Preparation of Particular Conditions – Part A – CEM Contract Data; Section 2: Guidance for the Preparation of Particular Conditions – Part B – CEM Special Provisions; Section 3: Guidance for the Preparation of the Schedule of Carbon Emissions; Section 4: Guidance for the Preparation of CEM inputs in the Specification; and Section 5: Guidance for the Preparation of CEM Amendments to the General Conditions of the DAAB Agreement and of the DAAB Procedural Rules. Before amending the wording of Sub-Clauses from the General Conditions, or adding new provisions, great care must be taken to avoid inadvertently changing the obligations assigned to the Parties by the CEM provisions.  

Additional information

Weight 500 g
ISBN

978-2-88432-125-9

Publisher

Fédération Internationale des Ingénieurs-Conseils (FIDIC

CONTENTS
Copyright
Acknowledgements
Acronyms/Abbreviations
Foreword
The FIDIC CM Guide and the Role of
the FIDIC CEM Guidance
The FIDIC CEM Guidance
Notes on the CEM Provisions
CEM Provisions for the Red Book 2017 Reprint 2022
Introductory Notes 13
Guidance for the Preparation of Particular Conditions – Part A – CEM Contract Data
for the Red Book 2017 reprint 2022 14
Particular Conditions Part A – CEM Contract Data 14
Introductory Guidance Notes 15
Notes on the CEM Contract Data 15
Guidance for the Preparation of Particular Conditions – Part B – CEM Special
Provisions for the Red Book 2017 reprint 2022 20
Particular Conditions Part B – CEM Special Provisions 21
Notes on the CEM Special Provisions 31
Optional Amendments 47
Guidance for the Preparation of the Schedule of Carbon Emissions 52
Introductory Guidance Notes 52
Notes on the Schedule of Carbon Emissions 52
Example Form of Schedule of Carbon Emissions 59
Guidance for the Preparation of CEM inputs in the Specification 62
Guidance for the Preparation of CEM Amendments to the General Conditions
of the DAAB Agreement and of the DAAB Procedural Rules 64
Introductory Notes 64
Guidance for the CEM Amendments to the General Conditions
of DAAB Agreement 65
Guidance for the CEM Amendments to the DAAB
Procedural Rules 66
Annex
Annex A – Example Calculation of CE Damages and CE Incentives 1

Similar Products